• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

My TechDecisions

  • Best of Tech Decisions
  • Topics
    • Video
    • Audio
    • Mobility
    • Unified Communications
    • IT Infrastructure
    • Network Security
    • Physical Security
    • Facility
    • Compliance
  • RFP Resources
  • Resources
  • Podcasts
  • Project of the Week
  • About Us
    SEARCH
Latest News

ASCO Power Technologies Drives Power Reliability for Glasgow Wastewater Treatment Plant

June 30, 2022 TechDecisions Staff

  • The Glasgow Wastewater Treatment Plant needed a backup power system to maximize uptime.
  • A community of over 3,000 people and surrounding ecosystems relied on the plant for sanitation.
  • ASCO Power provided a reliable solution needed for continuous power even during extreme conditions.

FLORHAM PARK, N.J.–(BUSINESS WIRE)–The Glasgow Wastewater Treatment Plant required backup power system improvements to mitigate power interruptions, provide essential sanitation to the community, and protect surrounding ecosystems. The town is nearly a five-hour drive from the nearest metropolitan center, making self-reliance and power reliability a priority. Glasgow’s project engineers turned to ASCO Power Technologies for a robust backup power solution.

ASCO Power’s latest Case Study summarizes how ASCO provided specification development support and solutions for the facility’s backup power challenges. These included approval drawings provided on the same day they were requested and subsequent delivery of rugged critical power products that are easy to select, procure, operate, and own.

ASCO Power provided an 800-Amp SERIES 300 Service Entrance Automatic Transfer Switch as well as a second transfer switch that would be integrated into a low-voltage switchboard from Schneider Electric. This provided the plant with the reliable service needed to maintain power availability even during extreme weather events.

ASCO Power Technologies is proud of its role in helping this mission-critical facility better serve the community that relies on it, which should experience higher power reliability, availability, and peace of mind for years to come. More information about the challenge, the solution, and the outcome is explained in the Glasgow Wastewater Treatment Plant case study.

Read the Case Study here: ASCO Case Study | Wastewater Treatment Plant | Glasgow, Montana, USA

About ASCO Power Technologies

ASCO Power Technologies has provided power reliability solutions for more than 125 years. The firm designs, manufactures, services, and supports automatic transfer switches, power control equipment, load banks, and critical power management appliances. ASCO products serve mission-critical functions in data centers, healthcare facilities, telecommunication networks, commercial buildings, and industrial operations. To learn more about any of ASCO’s premium products and services, call (800) 800 ASCO (2726), email [email protected], or visit www.ascopower.com. To receive updates on the latest news and updates, follow ASCO on Facebook, Twitter, and LinkedIn.

Contacts

Laurence Grodsky

+ 1 973 307 7352

[email protected]

If you enjoyed this article and want to receive more valuable industry content like this, click here to sign up for our digital newsletters!

Related Content:

  • Virgin Media O2 Partners with VMware to Complete…
  • SEON Expands Advanced Digital Device Fingerprinting to Counter…
  • Akumina Announces 86% Year-over-Year SaaS Bookings Growth as…
  • Skykit Survey: Sharing Data Dashboards Broadly with Employees…

Latest Downloads

Practical Design Guide for Office Spaces
Practical Design Guide for Office Spaces

Recent Gartner research shows that workers prefer to return to the office for in-person meetings for relevant milestones, as well as for face-to-fa...

New Camera Can Transform Your Live Production Workflow
New Camera System Can Transform Your Live Production Workflow

Sony's HXC-FZ90 studio camera system combines flexibility and exceptional image quality with entry-level pricing.

Creating Great User Experience and Ultimate Flexibility with Clickshare

Working and collaborating in any office environment today should be meaningful, as workers today go to office for very specific reasons. When desig...

View All Downloads

Would you like your latest project featured on TechDecisions as Project of the Week?

Apply Today!

More from Our Sister Publications

Get the latest news about AV integrators and Security installers from our sister publications:

Commercial IntegratorSecurity Sales

AV-iQ

Footer

TechDecisions

  • Home
  • Welcome to TechDecisions
  • Contact Us
  • Comment Guidelines
  • RSS Feeds
  • Twitter
  • Facebook
  • Linkedin

Free Technology Guides

FREE Downloadable resources from TechDecisions provide timely insight into the issues that IT, A/V, and Security end-users, managers, and decision makers are facing in commercial, corporate, education, institutional, and other vertical markets

View all Guides
TD Project of the Week

Get your latest project featured on TechDecisions Project of the Week. Submit your work once and it will be eligible for all upcoming weeks.

Enter Today!
Emerald Logo
ABOUTCAREERSAUTHORIZED SERVICE PROVIDERSYour Privacy ChoicesTERMS OF USEPRIVACY POLICY

© 2025 Emerald X, LLC. All rights reserved.